The latest additon to Burnham Associates' fleet is the new Dredge TRINITY. The TRINITY was built for BAI during the winter of 2009/2010 by Sterling Ship of Port Neches, TX.
She is a 39' x 130' x 7' dredge/barge hull designed to carry a 200,000 pound excavator. The TRINITY is being equipped with 65 ft. spuds and traction winches. She arrived in Boston on March 30, 2010 and is currently undergoing fit out in Boston.
Here the new TRINITY is temporarily playing host to one of our service cranes: a 670 P&H. It is on board to assist with the fit out of the dredge.